Showing posts with label videos. Show all posts
Showing posts with label videos. Show all posts

Saturday, 28 March 2020

Parallel operation of Alternators

Parallel operation of Alternators

Necessity of Operating the alternators in parallel



Continuity of service
•If power plant consists  only single unit
•In the event of breakdown of the prime mover or the
   Alternator
•Entire station will be
   shut down
•If several small units

   run in parallel
•If one unit fails the
   power is supplied by
   remaining units
To improve Efficiency
•Alternators operate most efficiently when delivering full load.

•Hence when load is light, single unit is used.

•When load increases, another unit can be run in
    parallel to share the load

Tuesday, 24 March 2020

Synchronous motor construction



Synchronous motor construction


In this  following video  we have disclosed the construction details of Synchronous motor.


video credits to  A maniramakrishna
•A synchronous motor is a  constant speed motor.
•It can be operated over a wide range of power factors.

•It is a doubly excited machine.

Electrical Synchronous Generator working

Electrical Synchronous Generator 




video credits by A Maniramakrishna 
  

In this video we have explain the following topics 
 Alternator working principle
construction dovetails
Types of Rotors
  • salient pole rotors
  • non salient pole rotor 
  • Armature stator winding 


Monday, 20 January 2020

Electrical Machines Lab- PARALLEL OPERATION OF SINGLE PHASE TRANSFORMERS

Electrical Machines Lab
for
 B.Tech / B.E /Diploma
&

  Electrical And Electronics Engineering 



PARALLEL OPERATION OF SINGLE PHASE TRANSFORMERS





In modern power distribution systems it becomes inevitable to suffice the increasing load demand very often, in such cases where there is only one transformer connected to accomplish this work become insufficient, another transformer is brought into parallel operation, To maintain the economics and load sharing of these transformers knowledge of the load shared by this transformer becomes important. 


To bring parallel operation, it needs to satisfy a few set of rules such as,
Ø  Primary windings of the transformers should be suitable for the supply system voltage and frequency.
Ø  Polarity should be maintained
Ø  The voltage ratings of both primaries and secondaries should be identical, as such, transformation ratio.
Ø  The percentage impedances should be equal in magnitude and have the same X / R ratio in order to avoid circulating current and to operate at different power factors.
Ø  To avoid circulating currents, the equivalent impedances should be inversely proportional to the individual KVA ratings.




  👇👇👇👇Android Apps for Students 👇👇👇👇
  
Electrical Machines Nptel Notes


gate previous papers


ese previous papers 

nptel Electrical machines videos


nptel power electronics notes


Electrical Machines Lab -OC & SC TEST ON 1–PHASE TRANSFORMER.

Electrical Machines Lab
for
 B.Tech / B.E /Diploma
&


  Electrical And Electronics Engineering 



OC & SC TEST ON 1–PHASE TRANSFORMER.




The difficulties in testing of large transformers by direct loading 
(I) large amount of energy has to be wasted in such test
 (ii) it is a stupendous (impossible for large transformers) task to arrange a load large enough for direct loading. 


Electrical Machines Lab -BRAKE TEST ON 3 - Phase INDUCTION MOTOR

Electrical Machines Lab
for
 B.Tech / B.E /Diploma
&


  Electrical And Electronics Engineering 

BRAKE TEST ON 3 - F INDUCTION MOTOR


 Determination of performance characteristics of 3 - F induction motor by conducting brake test.